The Ras Al Khaimah casino forms part of Wynn Al Marjan Island on Al Marjan Island, but it was not open to the public on 10 August 2026. Wynn's newest official guidance places the guest opening in September 2027.
The panel below distinguishes finished milestones from planned work and gives a date to each time-sensitive figure. Opening and operating details may move, so every entry is tied to the most recent official reference.
| Item | Confirmed status | Reference date |
|---|---|---|
| Resort status | Construction continues and visits are not yet possible | 10 August 2026 |
| Opening date | September 2027 | Wynn results, 4 August 2026 |
| Licence | GCGRA lists Island 3 AMI FZ-LLC, trading as Wynn Al Marjan | Current GCGRA register |
| Tower | 70 floors, with 352 metres above sea level as the final planned height | Current resort website |
| Accommodation inventory | The full 1,530 units are structurally complete | 2 February 2026 |
| Gaming area | 225,000 sq ft, about 20,900 sqm | Wynn 2025 annual filing, March 2026 |
A construction site is not a bookable hotel, restaurant or gaming floor. Wynn has an email update form, but submitting it creates neither a reservation nor an admission ticket.
Wynn Al Marjan Island will be Wynn's first integrated resort in the Middle East and North Africa, and its developers call it the UAE's first. The single destination is planned to bring together a hotel, licensed gaming facility, dining, entertainment, retail, spa, beach, marina and events centre.
The development spans more than 60 hectares on Al Marjan Island in Ras Al Khaimah, facing the Arabian Gulf. It is a joint venture involving entities linked to Wynn Resorts, Marjan and RAK Hospitality Holding; Island 3 AMI FZ-LLC is the entity shown in the gaming licence register.
The term integrated resort signals more than a hotel built around a gaming floor. Published material so far centres on rooms, restaurants, beaches, events and entertainment, while the detailed game mix has not been announced.
In its second quarter results dated 4 August 2026, Wynn said the resort will welcome guests in September 2027. That is the latest named month, replacing pages that mention only 2027, the first quarter of 2027 or spring 2027.
Earlier investor updates aimed for the first quarter of 2027. In May 2026, Wynn said a modest delay would be quantified later, and the August release supplied that detail by shifting current guidance to September 2027.
A company results release carries more weight than a property listing or travel blog, yet it is still forward-looking guidance while the resort is being fitted out. Check the official resort website and Wynn investor releases before paying for a non-refundable trip.
Reading the announcements in order prevents an earlier target from being confused with the current one. The sequence follows the Ras Al Khaimah casino from its initial proposal to a licensed facility under construction with a named opening month.
| Date | Milestone | What it means |
|---|---|---|
| 25 January 2022 | Joint announcement for a project on Al Marjan Island | The first announcement outlined the project's scope and schedule |
| 4 October 2024 | Wynn announced that the commercial gaming facility operator licence had been received | The development became the UAE's first licensed commercial gaming facility |
| 25 November 2025 | A site ceremony marked the 70-floor hotel tower reaching its top | The principal tower reached a visible construction landmark |
| December 2025 | Later Wynn updates recorded completion of structural concrete | Construction moved into the crown, facade and interior stages |
| 2 February 2026 | Facade reached 83%, all accommodation units were structurally complete and Wynn Bridge reached 48% | The most recent detailed release with construction percentages |
| 11 March 2026 | Work resumed after a brief pause | A progress report rather than an opening or cancellation notice |
| 29 June 2026 | Wynn announced an original Punchdrunk theatre production | The opening entertainment programme acquired a named headline show |
| 15 July 2026 | Wynn's investor presentation displayed extensive interior work in progress | The latest visual view showed active fit-out work |
| 4 August 2026 | September 2027 was named as the opening month | The current official planning date |
A Wynn project story places the 70-floor ceremony on 25 November 2025, whereas later corporate updates put structural concrete completion in December 2025. This timeline uses November for the site ceremony and December for the later construction record, preserving both references.
In its 2 February 2026 release, Wynn reported structural concrete through the roof of level 71 and 21,852 fitted facade panels out of 26,471, or 83%. The guest website still calls it a 70-floor tower, so both official descriptions are retained rather than turned into a derived floor count. Wynn has published varying interim height measurements, but the stable target is 352 metres above sea level once the spire is installed.
Elevators and escalators were being installed, while mechanical, electrical and finishing work continued through the guest inventory. Concrete and structural steel work on the low-rise buildings had reached 99%, a construction measure that does not make those areas ready for guests.
The new 548-metre Wynn Bridge is planned to carry the resort through Wynn Boulevard to E311 and E611. On 2 February 2026 it was 48% complete, piling had finished and nine of ten bridge column pile caps were in place; Wynn was targeting completion in late 2026.
Wynn's August results described rapid construction progress, and its second quarter presentation showed substantial interior work as at 15 July 2026. Neither publication gave a newer facade or bridge percentage, so the February figures remain dated rather than being extended by inference.
Wynn's 2025 annual report, filed in March 2026, records a 225,000 sq ft gaming area. That is about 20,900 sqm, and it is used here because the filing is the latest direct corporate source.
Older property and news coverage, including current search results, often repeats an approximate 18,500 sqm gaming floor. Wynn has not reconciled the two figures or said they describe different spaces, so 18,500 sqm remains an older estimate rather than an addition to the newer figure.
| Measure | Figure used | How to read it |
|---|---|---|
| Gaming area | 225,000 sq ft, about 20,900 sqm | The latest figure in Wynn's annual filing |
| Older figure still repeated online | About 18,500 sqm | An earlier estimate, not the lead figure |
| Development site | More than 60 hectares | The entire integrated resort, not just gaming |
| Hotel tower | 70 floors | The current description for guests |
| Structure in the February update | 299 metres through the level 71 roof | A dated build measurement, not the final height |
| Planned height with spire | 352 metres above sea level | The resort website's architectural target |
A floor area does not say how many tables or slots there will be, which games will be offered, or how space will be divided between general and private rooms. Wynn had not published those details by 10 August 2026, so an exact inventory requires a newer operator source.
Wynn's February construction update reported structural completion for all 1,530 accommodation units, although interior fit-out continued. The categories below are components of that total, so apartments, townhomes and estates are not counted a second time.
| Category | Number | Published description |
|---|---|---|
| Resort rooms | 1,217 | Rooms and suites within the main Resort Tower |
| Enclave suites | 297 | A hotel-within-a-hotel arrangement on the upper floors |
| Royal Apartments | 2 | Two apartments located at the tower's top |
| Garden Townhomes | 4 | Separate garden accommodation included in the plan |
| Marina Estates | 10 | Residences positioned beside the marina |
| Total | 1,530 | Current announced guest inventory |
Enclave is Wynn's hotel-within-a-hotel arrangement on the upper floors, with a separate entrance, arrival area and lifts. It is centred on suites and a distinct service setting, while rates, packages and the reservation opening date remain unannounced.
Older Wynn releases gave the figure 1,542, which competitors still repeat. The February 2026 construction release and current resort material provide a complete category breakdown totalling 1,530, the total used in this guide.
The current resort website lists plans for 22 restaurants, bars and lounges, along with a daytime beach club for guests and visitors. Wynn has named a French-American steakhouse by Alain Ducasse and another Delilah supper club, but restaurant reservations were not open at this update.
Wynn announced an original Punchdrunk production on 29 June 2026, scheduled to debut with the resort. Once bookings begin, guests are expected to choose between a seated upstairs performance and a roaming immersive route downstairs and backstage; dates and prices remain unreleased.
The plans include a naturally lit shopping parterre for luxury brands, although Wynn has not released the complete shop list. Art will run through public areas and guest rooms, with announced highlights such as Jeff Koons' 11-metre Tulips and historic and contemporary works by regional and international artists.
The plan provides 420 metres of private white-sand beach and a deep-water marina intended for large yachts. A daytime beach club is also planned, but day-pass prices and rules for non-guests have not been published.
Wynn lists 12 pools with cabanas and landscaped areas, plus a five-star spa, salon and fitness centre. Treatment prices, opening hours and pool-entry conditions are unavailable, so they cannot yet be included in a dependable visit budget.
The official amenities list places a kids' club beside outdoor recreation, indicating that the non-gaming parts of the resort are intended to serve families as well. Accepted ages, fees and supervision arrangements are not released, so childcare planning should wait for the guest policy.
Coral Court is planned as the resort's centre for events and celebrations, with a published area of 7,708 sqm. Its layout includes six reconfigurable meeting rooms, separate salons for brides and grooms, and private prayer rooms for men and women.
The Grand Ballroom measures 2,633 sqm, is column-free and overlooks the marina. Area alone cannot set its capacity because tables, stages, aisles and production equipment change the seating arrangement.
By 10 August 2026, Wynn had not released venue packages, prices or minimum spends. When sales begin, ask for a written capacity plan and a quote that covers production, catering, cancellation and accessibility instead of calculating attendance from area alone.
The resort sits on Al Marjan Island in Ras Al Khaimah, not Dubai. Wynn's website gives about 15 minutes by car from Ras Al Khaimah International Airport, while a 2025 Wynn financing release put the journey from Dubai International Airport at roughly 50 minutes.
| Starting point or route | Official information | Planning decision |
|---|---|---|
| Ras Al Khaimah International Airport | About 15 minutes by car on the resort website | Recheck the trip on arrival day because traffic varies |
| Dubai International Airport | About 50 minutes in Wynn's 2025 release, with the resort less than 50 miles away | Allow for baggage and traffic rather than treating the estimate as fixed |
| Wynn Bridge | Planned link through Wynn Boulevard to E311 and E611 | Completion was targeted for late 2026, so check that the route is open |
| Resort shuttle | No operating timetable or fare published | Do not build plans around an unannounced service |
| Parking and valet | Final operating details not published | Review arrival instructions when reservations begin |
The 548-metre bridge is meant to give the resort a more direct connection to the wider road network, but the latest detailed release still treated it as a construction project. Wait for Wynn to announce completion or for a current mapping service to show the route open.
After bookings open, check the final drop-off point because the hotel, events centre and marina may have separate entrances. Leave contingency time and do not pay for a transfer unless a written reservation confirmation includes it.
The GCGRA licensee register places Island 3 AMI FZ-LLC, trading as Wynn Al Marjan, in the land-based gaming facilities category. On 4 October 2024, Wynn announced that the project entity had received the UAE's first commercial gaming facility operator licence.
The register shows that the named entity holds a GCGRA licence for this particular land-based facility. The Game LLC appears separately as the UAE Lottery operator, so lottery products and land-based facilities occupy different licence categories. Wynn Al Marjan is expected to become the Gulf Cooperation Council's first licensed casino when it opens; broader regulation is covered on our UAE gambling laws page.
Before players are admitted, Wynn should publish the gaming floor's final age, identity, admission, responsible gaming and complaints arrangements. Until those terms are available, rules from other Wynn properties should not be applied here.
Operating arrangements can change during the months before opening, which makes the unknowns worth listing alongside confirmed figures. The table keeps an email registration, design image or third-party offer from being mistaken for a booking or operating commitment.
| Detail | Status on 10 August 2026 | What to do |
|---|---|---|
| Hotel bookings and room rates | Reservation date and prices not announced | Subscribe to official updates and wait for Wynn's booking engine |
| Restaurant reservations | Not open on Wynn's dining page | Do not pay an unverified intermediary for a table |
| Casino game list | Table, machine and title counts not published | Use the operator's future gaming information |
| Betting limits | Minimum and maximum stakes not published | Do not import limits from Wynn Las Vegas |
| Age, ID and admission charges | Final Wynn conditions not published | Review Wynn and GCGRA before travelling |
| Dress code and opening hours | Not published | Read the guest guide once it appears |
| Shuttle, parking and valet | No operating timetable or pricing published | Ask for confirmation with the hotel booking |
| Theatre tickets | Interest registration available, schedule and prices incomplete | Keep registration separate from a ticket |
Wynn's website collects email addresses and areas of interest for news and early updates. That action reserves no room, restaurant or theatre seat, and fixes neither price nor priority without a separate booking confirmation.
Use the resort website first, compare the licence with the GCGRA register, then compare the opening date with Wynn's newest investor release. When an official channel does not state a detail, label it unannounced rather than borrowing another resort's policy.
This page and its gaming material are for adults aged 18 and over. GCGRA advertising standards define anyone below 21 as underage for commercial gaming other than lottery. Wynn had not released its final gaming-floor identity and admission policy by this update, so check it before travelling and do not assume hotel access covers every resort area.
For an illustrative example, imagine a future one-day entertainment budget of 800 United Arab Emirates dirhams (AED), not a Wynn price. Reserve AED 500 for transport, food and contingency, and set AED 300 as the absolute gaming ceiling whatever the result.
Choose the money limit and finish time before entering the gaming area, keeping spare cards or funds outside the plan. Once either limit is reached, leave rather than shifting contingency money into another stake or chasing a loss.
Stop when gaming brings hidden spending, borrowing, anxiety, or neglect of work and relationships. Our responsible gambling guide covers warning signs, a stopping plan and support options in greater detail.
The answers below use official information available on 10 August 2026. Revisit the opening date and entry terms when reservations begin because future operating details may change.
No. Construction is still under way, and Wynn said on 4 August 2026 that guests are expected to enter the resort in September 2027.
Wynn's latest official guidance points to September 2027. Its second quarter results on 4 August 2026 supplied that month and superseded the earlier first quarter and spring 2027 guidance.
The resort is on Al Marjan Island in Ras Al Khaimah, rather than in Dubai. Wynn places Ras Al Khaimah International Airport about 15 minutes away by car.
Wynn's latest annual filing gives 225,000 sq ft, or about 20,900 sqm. Older project coverage supplies the approximate 18,500 sqm figure, so this guide follows the newer company filing.
The announced total is 1,530 accommodation units: 1,217 Resort rooms, 297 Enclave suites, two Royal Apartments, four Garden Townhomes and 10 Marina Estates.
The General Commercial Gaming Regulatory Authority, GCGRA, issued the licence to Island 3 AMI FZ-LLC, trading as Wynn Al Marjan. Wynn announced the UAE's first commercial gaming facility operator licence for the project on 4 October 2024.
By 10 August 2026, Wynn had not announced a hotel reservation opening date, and its dining page said restaurant bookings were still closed. An email-list registration is not a booking and promises neither a rate nor priority.
By 10 August 2026, Wynn had published neither a table game list nor a slot count or betting limits. Use the operator's future gaming information and entry terms instead of borrowing details from another Wynn resort.
Wynn gives an approximate 15-minute drive from Ras Al Khaimah International Airport and earlier estimated about 50 minutes from Dubai International Airport. Traffic affects both journeys, while Wynn's February 2026 update still described Wynn Bridge as under construction.
GCGRA advertising standards classify anyone under 21 as underage for commercial gaming other than lottery. Wynn had not released final gaming-floor ID and admission rules by 10 August 2026, so visitors should review Wynn and GCGRA terms before travelling.